There are other hybrid options too.
Piers. Piers consisting of augered holes down to solid earth or rock filled with concrete. The piers would likely be spaced 6' apart filling the entire footprint. The floor could be poured monolithically with the piers. Load bearing walls could benefit from pier loactions.
Pilings. My builders license instructor built an entire house on pilings in swampy land (pre wetlands law). Pilings look like telephone poles and driven into the ground (sometimes 70') and terminate either at or below ground. The building is built upon them. This is very common in the South. However they drive them into the ground one atop the other with as much as 28' sticking out of the ground.
Grade beams and footers. Footers could be dug to stable ground. Rather than remove and not replace all the dirt inside, grade beams made of concrete connected to the walls and reinforced, lay in a trench at or just below grade. Grade beams would go under load bearing walls. And they would support the poured floor.
Basement. If you want more space and less cost to backfill, build it conventionally with wood or steel foor joists, and wood floor.
|
|
Add Photo
Bookmarks: |
|
|
|
Foundation compaction
EW, I think you're forgetting about one little tidbit of critical information.
The OP "HighHopes" is located in Santa Cruz, CA., I doubt a few of your options would be allowed for seismic protection reasons, and if they were, it would add dramatically to the overall cost.
One of the reasons they like 'slab on grade' so much for seismic areas is that it makes the house sort of independent of the motion of the earth. It can sort of wiggle around on the surface, as opposed to being twisted when the above & below ground portions move at different rates and / or in different directions.
Best of luck.
|
|
Add Photo
Bookmarks: |
|
|
|
Foundation compaction
Murf you saying they want "Mobile Homes"? Never can think of any mobile homes in the south being damaged by earth quakes. Now drunk driver different story. 
|
|
Add Photo
Bookmarks: |
|
|
|
Foundation compaction
To fill the excavated area, search your own 27 acres for good soil. Then compact it as others have recommended.
Another option is to drill pier footings down to minimum 5'. An engineer will design the perimeter footing as reinforced concrete beams to span between the piers. This is most likely going to be the cheapest, easiest solution.
|
|
Add Photo
Bookmarks: |
|
| |
|
Page | [ 2 ] | Thread 173889 Filter by Poster: 2 | 2 | 4 | 1 | 4 | 1 |
|
()
Picture of the Day candoarms
Unanswered Questions
Active Subjects
Hot Topics
Featured Suppliers

|