 05-20-2004, 12:14 Post: 86454
MacDaddy



View my Photos

View my Photos  Pics
Join Date: May 2004
Location: Western NY
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 95

3
Filter by User
 Advice Needed - Gravel Driveway Construction

I am in the process of purchasing a property where the house will be placed 1600’ off the main road. I intend to install a 10'w gravel/stone driveway, but would like to know what people recommend for the cross-sectional design… ie: how deep should the box be, how much gravel, how much stone, fabric placement... etc. The soil is mostly clay, and is moderately well drained. (Firm in the summer…. softer in the spring). Secondly, roughly how long would it take an operator to complete this project assuming there is no clearing required and the slope is gentle. At this point, im just trying to get a handle on the costs involved in installation. Any advice would be much appreciated. Please be specific on type of stone or gravel you recommend. Thanks!!






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
 05-21-2004, 13:58 Post: 86529
yooperpete



View my Photos

View my Photos  Pics
Join Date: Jan 2004
Location: Northern Michigan
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 1413
 Advice Needed - Gravel Driveway Construction

There are allot of variables in making the calculations. Some contractors can cut corners others won't, so you may see a broad price range. Some are hungrier than others. I'm not a professional by any means. That is one long driveway and you better have deep pockets.

First of all, you will need to set grade. That means you need to figure the height of the driveway and you will want it to gently slope at the sides so the rain/snow washes off for drainage. Generally you would have this done with a Cat to plow out and even the grade and establish the drives shape and geometry, particularly if you have curves or a wider spot in between for cars to meet. Someone needs to stake this out for location, width and depth. You will want to fill this with some nice sand and pack it down with a street roller. You will then want to fill the remaining with a limestone mix something like zone 4. You should plan to spread this about 8" thick loose so it can compact down to 6" when the roller goes over it. Depending upon your soil, you may also want about 6" of sand. The sand will compact also. The excess black dirt that the dozer pushed out can be graded back in for the gentle slope along the sides. 1 yard of stone equals 1 1/2 tons. One yard is 27 cubic feet. So for a 10' wide driveway x 6" deep, a yard will go 5.4'. For a 1600' driveway you would need atleast 296 yards of sand. For a 10' wide driveway x 8" deep, a yard will go 4.05' For a 1600' driveway you would need atleast 395 yards of stonemix.

The price of the product depends on your location with regard to the source. The more you get per trip, the cheaper it is. If you have a good access road and a big place for them to turn around, you could get a gravel train to come in. The lead hauls about 27 ton and the pup about 23 tons. That whole rig is big and long(i.e. about 60') and needs lots of room to maneuver. The fifty ton of stone is about 33 yards. That's allot of stone and allot of trips. If you don't have allot of room, you will just get the lead with 27 ton per trip. That is still a big truck. Smaller dump trucks usually are about 15 ton. The weight of all that requires a good road and driveway entrance. Stonemix usually goes for $12.00 to $15.00 per ton delivered if it is about 10 to 15 miles away. Sand is cheaper and also varies with location and availability.

I have no clue as to contractor pricing but know you have a big project ahead that requires big equipment. After it is packed in and in place you will need to fill some spots and may want to use a finer stone later for dressing. You may be able to cut corners on thicknesses depending upon the driveway use and soil conditions. I wouldn't think that you need any barrier. That would slow drainage. To cut corners, you can investigate the use of crushed asphalt as your base and top it with limestone mix (commonly called crushed stone or stonecrete). This stuff has an aggregate of fines that hardens and compacts with pressure and moisture over time to get hard something like concrete. In the early spring it does soften. From allot of traffic the stone will separate and you will need to topdress for appearance. I'd plan on putting a nice turn around someplace in the design that is out of the way that someone can dump a load of stone later for top dressing.






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
 05-23-2004, 04:36 Post: 86626
grinder

TP Contributor

View my Photos

View my Photos  Pics
Join Date: Oct 2003
Location: central Maine
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 677

4
Filter by User
 Advice Needed - Gravel Driveway Construction

I assume you get snow where you are,therefore I would make it a min. of 15' travel surface,for snow removal and passing.
An 18-24 in. base of good clean sharp gravel(not stone)
for a base should be sufficent. I would use a 6" minus
product.(all stone bigger than 6" screened out. Frost will
pick up anything bigger to the surface.
Then topcoat with 2-3 inches of 1-2" minus or reclaimed asphalt. Loose stone on the surface will not freeze solid
and is a pain to plow or blow. Reclaimed asphalt doesn't
mud up and heads you in the right direction for paving down the road. Also it is easily regraded year to year.






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
 05-23-2004, 06:25 Post: 86632
TomG

TP Contributor

Join Date: Feb 2002
Location: Upper Ottawa Valley
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 5406
 Advice Needed - Gravel Driveway Construction

Depends on the soil, drainage and traffic it'll carry. I'd check with neighbours to get an idea of what works. Could be as simple as removing the topsoil and bringing the grade up to surface plus crown with pit run.

Pit run with crowns plus mild ditching is what works around here for private drives except where the drainage is poor or grades steep enough to cause erosion. Two years ago I re-graded the slope to get more of the yard to drain down the drive to the highway and added another tandem load of pit run. I finally got my tractor work in gear after a wet spring and noticed that the drive is nicely compacted without dips and bumps. I don't think I'll touch it this year except some ditching cleaning. The drive does carry single axle truck traffic for oil delivery and the weight doesn't dint the compacted surface.






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
 05-30-2004, 21:24 Post: 87307
MIFarmin



View my Photos

View my Photos  Pics
Join Date: Mar 2004
Location: Michigan
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 34
 Advice Needed - Gravel Driveway Construction

I had to improve the two track to my property to build my house last fall; $16,000 worth. The county spec's were grub, grade, and gravel; 28 ft wide cleared, with 12 inches sand and 6 inches gravel 12 ft wide. I had 2000 running ft. Grubbing was tearing out trees and stumps. That was half the cost. You will save a lot not doing that. A large backhoe would dig a few scoops around the stump and then push the tree over, using the weight of the tree to pull the stump loose. I followed him with a chain saw and cut the stump loose and he pushed it to the side. A dozer was then used to grade the road to a nice even flow, no dips and small hills taken down a bit. Where I live it was all sand, wow! Saved about $5000. The gravel was about $8000. including the dozer to spread it, which was the best way to go. He got a nice crown in the center to shed water. In a few water problem spots we plowed out a small catch basin next to the road. Our cars packed it down just fine. Four other neighbors on the road enjoyed the fix up. The first few months I graded it with my JD and box blade. Now its staying smooth and solid. A good road gravel will go a long way; some clay in it helps for packing. In front of the garage I used Dolomite. It packs like cement, but spread it thin, it doesn't go a long way. One more thing to consider; another attachment I treasure is my snowplow blade for my JD, since it's up to us to keep the road plowed in the Michigan winter!






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
 06-04-2004, 23:51 Post: 87766
HuckMeat

TP Contributor

Join Date: Jan 2004
Location: Colorado
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 121
 Advice Needed - Gravel Driveway Construction

I just had my driveway done - The first 1000 feet were pretty gentle slopes, with 2 culverts and build up in the crossings of the draws where the culverts are. The last 650 feet are in boulder strewn foothills, and took some work.

I had a minimum 12' wide road cut, and needed some blasting (in the boulder area) and my excavator, also my neighbor, charged me almost $15000, plus another $8k for putting down 7" of pit run on it. This included compaction, etc before the final grading and pit run. Even before pit run, I ran 20+ cement trucks over it without rutting - A tribute to the dirt work, since the exsisting road leading to my drivway didn't fair as well.

My geography tends to be expensive, but I did get a pretty good deal. Other excavators were charing about $1 per square foot of road space, excluding pit run.






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
 11-25-2004, 09:23 Post: 101003
rpelleschi



Join Date: Nov 2004
Location: Spotsylvania, Va
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 56

5
Filter by User
 Advice Needed - Gravel Driveway Construction

Hi, I am putting in a drivway and read your old post. Could you explain "pit run with crowns"? I have an old loader and would like to do the job myself. The road will be about 800' so I am trying to do a lot myself and keep the cost down.
Thanks
Randy






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
 11-26-2004, 05:00 Post: 101052
grinder

TP Contributor

View my Photos

View my Photos  Pics
Join Date: Oct 2003
Location: central Maine
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 677

4
Filter by User
 Advice Needed - Gravel Driveway Construction

Maine definition: Pit Run or Bank Run,is in other words "as is"out of the gravel pit bank. Not run through a srceen.
Crown in the road refers to the finish grade, leaving the middle higher than the edge to shed water and reduce potholes,and mud. Like alot of things we build, water is the enemy and proper site prep.,subgrade, base material,surface material, drainage and elevations are critical to a road that will last.
It all depends on the site,as to what's needed.
good luck.






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
 11-26-2004, 17:34 Post: 101115
earthwrks

TP Contributor

View my Photos

View my Photos  Pics
Join Date: Dec 2003
Location: Home Office in Flat Rock, Michigan
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 3853
 Advice Needed - Gravel Driveway Construction

I agree with all the other posts, but would add that using the geo-fabric is a wise choice. Half of our 1000' road was done with fabric and the results are astounding. We had over 1,250 40-yd gravel trains delivering clay backfill for the adjoining 13 acre property for 6 months straight. The half that didn't have the fabric sank 6" - 8"---the wet clay under and along the road liquefies and literally oozes out and up along the roadway effectively creating a reverse ditch (the road being the ditch). After spreading another 800 ton of stone the road is almost back to where it was, and the oozing hasn't stopped.






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
 11-29-2004, 12:29 Post: 101242
MacDaddy



View my Photos

View my Photos  Pics
Join Date: May 2004
Location: Western NY
TractorPoint Premium Member -- 5 Tractors = Very Frequent Poster
Posts: 95

3
Filter by User
 Advice Needed - Gravel Driveway Construction

Thanks to everyone for all the advice. I have completed the driveway and am quite satisfied w/ the results. The total length is 1800 ft. I increased the width to 12’ and added some passing areas. The contractor boxed-out 12 to 18 inches, placed geotextile fabric in the box and backfilled with 15 – 20” of “bank run” (as is from the bank – not screened). The composition was very good with a good mixture of larger stones and fines. The total material quantity was 2300 ton. at $6.25/t including trucking. This equates to about 115 truckloads of material, which helped a lot with compaction. Each truck hauled about 19 – 24 tons. The material was then “tracked-in” with a dozer. I also added two culvert crossings where it was necessary to divert runoff. After the material was placed, it was further compacted with a vibratory roller. The roller did a good job, but Mother Nature and time do the most effective packing. Two weeks and a few rainfalls after the drive was completed, it really hardened-up. It was markedly firmer after a few weeks than it was the day the contractor left. At some point in the future, I plan to add a couple of inches if #1 stone as a wearing course. With all materials and labor, I paid about $11.90/running ft., and it took seven full days to complete. Thanks again for all of you who helped in my decision making.






Reply to PostReply | Quote Post Reply to PostQuote Reply | Add PhotoAdd Photo




Bookmarks: Digg It | Del.icio.us |
Reply | Pop Up Window Reply | Add PhotoAdd Photo


Page [ 1 ] | 2 | 3 | | Next >>

Discussion Boards > Active Subjects > Messages as Posted > Excavation Forum

Thread 86454 Filter by Poster:
brokenarrow 1 | earthwrks 1 | grinder 4 | HuckMeat 1 | MacDaddy 3 | MIFarmin 1 | Murf 3 | rpelleschi 5 | TomG 1 | Woodie 1 | yooperpete 1 |

 (advanced search)

Picture of the Day
DennisCTB

All Terrain Vehicles - Seed and Fertilizer Spreader for ATV
Seed and Fertilizer Spreader for ATV


Unanswered Questions

Gas Generator Weather Protecti
Horse Injured Polyrope Electri
Do electric fences keep out de
Any Peruvian Paso Owners Out T
gas powered post driver
My new born foal is really sic
Trailer Axle
dump trailer blueprints


Active Subjects

Gas Generator Weather Protecti
Went to see Dennis Reis this w
Signs to look for prior to lab
leg injury
Broodmare has welts all over h
Some Christmas Humor For Horse
poles in the ground vs. concre
ever thought about moving?


Hot Topics

new app owner
Some Christmas Humor For Horse
Any Peruvian Paso Owners Out T
Heating a Garage
Gas Generator Weather Protecti
Do electric fences keep out de
gas powered post driver
Trailer Axle


Featured Suppliers

Mountain Creek Labradoodles
      MountainCreekLabradoodles.com





New Forums on Gun Sport Shooting and Hunting -- BarrelPoint.com  New Forums on Horses ManePoint.com
Talk Horses at ManePoint
Hunting + Gun Sports at BarrelPoint



Most Viewed

+ Digging out a pond
+ Advice Needed - Gravel Driveway Construction
+ How much cover for culvert
+ Poor Man s Transit
+ SOURCES FOR FREE FILL DIRT
+ Dirt Compaction
+ Gravel Driveway Maintenance
+ Estimating Cubic Yards
+ Options to raise concrete driveway
+ lots of downed trees

Most Discussion

+ Digging out a pond
+ Advice Needed - Gravel Drivewa
+ SOURCES FOR FREE FILL DIRT
+ Poor Man s Transit
+ Skidsteers
+ Right machine for Excavation
+ Digging Small Lakes
+ Gravel Driveway Maintenance
+ Dirt Compaction
+ Regrind over asphalt

Newest Topics

+ Options to raise concrete driveway
+ Lonking CDM6090 and Hyundai R60CR-9
+ Grading around pond
+ pond outflow design
+ lots of downed trees
+ Digging Small Lakes
+ Regrind over asphalt
+ Using plate compactor on soil
+ sumitomo excavator
+ Gravel Driveway Maintenance
















Turbochargers for Tractors and Industrial Machines
Cab Glass for Tractors and Industrial Machines

Alternators for Tractors and Industrial Machines
Radiators for Tractors and Industrial Machines

Driveline Components for Tractors and Industrial Machines
Starter Motors for Tractors and Industrial Machines